CIMARRON HIGH SCHOOL |
SIZE: 18,000 SF |
YEAR: 2018 |
CLIENT: CIMARRON SCHOOL DISTRICT |
LOCATION: CIMARRON, NM |
CONTRACTOR: BLUE SKY BUILDERS |
CONSULTANTS: |
LDG spent the spring semester working with the Cimarron School District to design the remodel of their High School. The scope of the project included: the renovation of existing classrooms, teachers lounge, restrooms, and library-turned-media center. This was a “fast-track” project, meaning, construction started while LDG was still designing. As with many school projects, construction was limited to the summer – around 90 days. It required that LDG always be available to answer any questions and resolve any issues that arose due to unknown existing conditions. LDG also helped pick materials and finishes during the project. Living Designs Group delivered the design and construction documents, on-time and within budget. LDG went beyond the architect’s call to provide not only the scope, but to schedule, communicate, and execute the project. The LDG Team provided rapid design iterations and pursued constant feedback from the administrators, contractor, and staff. |